EDUCATION PROVIDER PROGRAM (EPP)

Interested In Becoming a Course Provider?

New Course Providers are required to submit the following completed documents for review:

Please download the appropriate form(s) for completion and send to EPP@aanb.org

Questions?

  • Please contact EPP@aanb.org if you have questions regarding the Program.

AEC Daily Corporation

AEC Daily is one of the largest providers of continuing education (CE) to the Construction, Architectural, Interior Design and Engineering communities. Complimentary courses are available 24 hours per day, 7 days per week, with automated credit reporting to numerous organizations across the United States and Canada. Architects, Engineers, Interior Designers and other Construction Professionals rely on AEC Daily to maintain their accreditation and keep them up-to-date with new products and technologies.
  • Contact: Sule Benavides | Client Services Coordinator
  • Phone: (877) 566-1199.
  • Email: sbenavides@aecdaily.com
  • Website: https://www.aecdaily.com
  • Course Description: AEC Daily: Life-Cycle Cost Analysis for Interlocking Concrete Pavements

    ONGOING - 1 HOUR - FREE

    This presentation provides a review of life-cycle cost analysis (LCCA), a process increasingly conducted by road agencies for pavement projects. LCCA enables and, in some cases, justifies a pavement type that best meets an agency’s needs and budget. This presentation emphasizes the whole-life costs for interlocking concrete pavements (ICP), which combine the performance advantages of conventional concrete and asphalt with potentially lower life-cycle costs compared to other pavement materials.

    ONGOING - 1 HOUR - FREE

    INFORMATION AND REGISTRATION

    Learning Objectives:

    Define LCCA and its function in evaluating pavement costs over time and hence the return on investment.

    Identify the variables of a life-cycle cost analysis and their role.

    Explain how to utilize life-cycle costing as a primary tool to evaluate pavement performance.

    Identify the differences between deterministic and probabilistic cost methodologies used in LCCA.